I-10 Gila River Indian Community ProjectMileposts 161 – 172

Loop 202 to the Gila River segment includes the construction of a third general-purpose lane in each direction in the median of I-10, one HOV lane in each direction from Loop 202 to Riggs Road also in the median, the reconstruction of interchanges at Wild Horse Pass Boulevard/Sundust Road, Queen Creek Road/SR 347, and Riggs Road, and the widening of Goodyear Road. Several other infrastructure improvements will be constructed, including freeway management systems that use a fiber optic backbone, cameras, and dynamic message signs. In addition, full freeway lighting will be installed from Loop 202 to Riggs Road.

Construction is scheduled to begin in mid 2026 and would last until early 2028. This project would cost approximately $450.3 million.

Expected Construction Timeline Mid 2026 – Late 2028

A map showing the project segment limits of the I-10 Gila River Indian Community Project, from the 202 to the Gila River.

Construction Updates

Updated: 00/0000

  • Lorem ipsum dolor sit amet consectetur. Netus sed morbi enim purus sagittis imperdiet sed dictumst.
  • Nisl aliquam in id massa nibh integer quisque morbi. Ornare in vel risus sed scelerisque egestas eu.
  • A eu et duis at viverra pulvinar. Mi sed augue quam venenatis.
  • Proin malesuada tempus orci sit gravida tempor. Id convallis justo fringilla ut magna nisl ipsum et adipiscing.

Renderings/Photos

  • Group 14886.jpgLorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna.
  • Group 14886.jpgLorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna.
  • Group 14886.jpgLorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna.