No lane restrictions or closures scheduled for the corridor
I-10 Gas line Road to South of SR 387 Mileposts 177 – 187
- 
	Add third general-purpose lane in each direction within the existing median 
- 
	Construct new interchange at Seed Farm Road to improve access for the Gila River Indian Community 
- 
	Reconstruct Pinal Avenue/SR387 interchange 
- 
	Reconstruct and widen Gas Line Road Bridge 
- 
	Remove Dirk Lay Road Bridge structure 
- 
	Improve infrastructure and install freeway management system: fiber optic cable, CCTV cameras and overhead message boards 
Construction is anticipated to begin in early 2026 and last approximately two years, with an estimated construction cost of $267.9 million.
Expected Construction Timeline Early 2026 – Late 2027

Construction Updates
Updated: 00/0000
- Lorem ipsum dolor sit amet consectetur. Netus sed morbi enim purus sagittis imperdiet sed dictumst.
- Nisl aliquam in id massa nibh integer quisque morbi. Ornare in vel risus sed scelerisque egestas eu.
- A eu et duis at viverra pulvinar. Mi sed augue quam venenatis.
- Proin malesuada tempus orci sit gravida tempor. Id convallis justo fringilla ut magna nisl ipsum et adipiscing.
Renderings/Photos
 
 
 