Overnight lANE RESTRICTIONs westbound I-10 near gila river bridge march 30 - April 4
I-10 Gila River to Gas line Road Mileposts 174 – 177
-
Add third general-purpose lane in each direction within the existing median
-
Reconstruct Casa Blanca Road/SR 587 traditional Diamond Interchange
-
Reconstruct and widen Nelson Road Bridge
-
Improve infrastructure and install freeway management system: fiber optic cable, CCTV cameras and overhead message boards
Construction is anticipated to begin in late 2026 and last approximately two years. Construction cost for this project is approximately $158.4 million.
Expected Construction Timeline Late 2026 – Mid 2028
Construction Updates
Updated: 00/0000
- Lorem ipsum dolor sit amet consectetur. Netus sed morbi enim purus sagittis imperdiet sed dictumst.
- Nisl aliquam in id massa nibh integer quisque morbi. Ornare in vel risus sed scelerisque egestas eu.
- A eu et duis at viverra pulvinar. Mi sed augue quam venenatis.
- Proin malesuada tempus orci sit gravida tempor. Id convallis justo fringilla ut magna nisl ipsum et adipiscing.
Renderings/Photos
Lorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna. Lorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna. Lorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna.