I-10 Gila River to Gas line Road Mileposts 174 – 177

  • Add third general-purpose lane in each direction within the existing median

  • Reconstruct Casa Blanca Road/SR 587 traditional Diamond Interchange

  • Reconstruct and widen Nelson Road Bridge

  • Improve infrastructure and install freeway management system: fiber optic cable, CCTV cameras and overhead message boards

Construction is anticipated to begin in late 2026 and last approximately two years. Construction cost for this project is approximately $158.4 million.

Expected Construction Timeline Late 2026 – Mid 2028

20250129_I-10 WHP Corridor_Map_MASTER_I-10 WHP_Gila River to GL Rd_Short.png

Construction Updates

Updated: 00/0000

  • Lorem ipsum dolor sit amet consectetur. Netus sed morbi enim purus sagittis imperdiet sed dictumst.
  • Nisl aliquam in id massa nibh integer quisque morbi. Ornare in vel risus sed scelerisque egestas eu.
  • A eu et duis at viverra pulvinar. Mi sed augue quam venenatis.
  • Proin malesuada tempus orci sit gravida tempor. Id convallis justo fringilla ut magna nisl ipsum et adipiscing.

Renderings/Photos

  • Group 14886.jpgLorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna.
  • Group 14886.jpgLorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna.
  • Group 14886.jpgLorem ipsum dolor sit amet consectetur. Eget maecenas turpis at egestas urna.